Precis led an in-house team of mechanical engineers for upgrades to Riddle Memorial Hospital’s main central utility plant. Engineering design was preceded by a study of the existing 1,500-ton primary-secondary plant and analysis of return on investment (ROI) for different chiller options.
Key components of the project included an analysis of the hospital’s natural gas and electric tariffs; complete operating energy analysis of the central plant, including mathematical models of upgrade alternatives; and a master plan of upgrades to the hospital’s distribution systems.
Precis designed a replacement chiller and new header system, upgraded pumps, optimized the cooling tower, provided a new free cooling system, and replaced the central plant control system. The solution resolved operational problems that had plagued the hospital since its original construction in 1961.
Corporate Headquarters
201 South Maple Avenue
Suite 200
Ambler, PA 19002
215.540.9800
North Carolina Operations
1100 Crescent Green
Suite 100
Cary, NC 27518
919.650.1820
Precis Engineering + Architecture
© 2005-2025 Copyright All Rights Reserved