Penn State – Beaver Stadium East Suites Renovation

Precis designed renovations to the existing third-floor VIP suites on the upper east side of Beaver Stadium, the nation’s second-largest stadium. Following demolition of the west side press, operations, and production suites, some of the existing VIP suites on the east side were converted into new homes for these critical game-day operations. Design of the new operations suites and upgraded VIP suites involved an integration of new furniture systems that were coordinated with the data and power services requirements transferring from the west side. The new suites also included upgraded finishes and technology.

This project involved careful coordination with multiple users’ needs as well as achieving the future goals of the university, intercollegiate athletics (ICA), and football operations. The Precis Engineering + Architecture team collaborated with the university’s operations, broadcast, and technology groups; the BIG 10 networks; the Penn State Division 1 football program’s coaching needs; and various other programs and users that will occupy the East Suites.

Share This Project:

Client:

The Pennsylvania State University

Location:

University Park, Pennsylvania

Facility Type:

Higher Education / Stadium

Size:

20,000 sf

Construction Cost: