Compliance Upgrades

Precis provided mechanical, electrical, plumbing, fire protection (MEP/FP), and process engineering services for a new building addition and renovation of 40,000 sf of GMP multi-product biological pilot plant space. Renovations were required to upgrade the suites to comply with quality and regulatory agency requirements. The design included a new second-story locker room addition, fire water containment, aseptic isolator, airlock and suite reconfiguration, and renovation of existing utilities including water for injection (WFI), clean filtered gases, HVAC, and electrical.

Precis also designed an 18,000-sf renovation of the first-floor pilot plant, which included a new Occupational Exposure Band (OEB) 3-4 weigh and dispensing area and new media and buffer prep area. The project added gowning modifications and additional airlocks to accommodate GMP compliance requirements. A new Biosafety level (BSL) 2+ laboratory area was built which included a -70°C reach-in freezer area within a -25°C cold storage area.

Share This Project:

Client:

Confidential

Location:

Pennsylvania

Facility Type:

Biological Pilot Plant

Size:

58,000 sf

Construction Cost:

$20 million